Wednesday, August 31, 2011

August Progress - Stanvac

The plant models were built some time back one by a Monday crew member and the other by my son Adam. I modified some "Bachmann Oil Tank w/Blinking Light Kit" by removing the "Blinking lights and fitting a "top plate" cover. I have a "Cornerstone Oil Loading Platform" under construction to be placed between loader tracks 3 & 4.

Three "Propane Storage Tanks" are en-route from Walthers these will be placed between the fuel tanks and plant. Some work awaits to complete other product delivery structures.

Barry has placed the Fuel Tank failure retention banks.



Loader tracks 3 & 4

Base for packaged goods building and platform




View down the Iron Hill Branch with Stanvac on the right

Packaged Goods Building base framework ready for detailing

Construction of Fuel Tank failure retention banks


End of Part 4

Part 1 - Intro
Part 2 - Hornertown
Part 3 - Adamsville
Part 5 - Jimtown
Part 6 - Onka River Valley
Part 7 - Helix and Flintston

No comments:

Post a Comment