Wednesday, June 23, 2010

Work Continues

Wiring

Last Monday night Bill and Chris drilled the framework then started installing the five mainline bus wires behind Flintston.











Chris followed up on Tuesday by commencing installing droppers on every length of each track.





Trackwork

Rossco continued with the quality assurance regime and checked the mainline on the top deck of the south wall then around behind Iron Hill - sorry Rossco I did not get any pictures...

Scenery

On Monday night BJ and Barry continued with the ground cover to LeMaistre Loco approach which was glued down by the end of the night. They also fashioned styrene to form the basis of the cuttings where the tunnel portals will be fitted later on.









Ground cover and ballast was completed on the top deck along the southern wall from Jimtown towards Iron Hill.











On Tuesday BJ started gluing down the ballast on the mainline.







LeMaistre Control Panel

On Monday night Bill 2 and I tagged out the point indication wires. Bill 2 then started fixing the individual wires near to their termination points. On Tuesday I terminated the wires at the panel end.





Thanks Guys