Wednesday, November 25, 2026

November Update

                                        

This month has seen things happening on Tools, Maintenance, Ops Sessions, Tasks completed & scheduled.



New Tool


My ability to hold things steady especially when soldering has diminished so I needed to secure a tool to assist me,  I found a magnet based one and it seems to work pretty well.





Maintenance


There a few loco issues addressed since my last update.

Locos

SP RSD-15 5159

Mainline Loco 5159 decided it would derail in a number of locations so was removed from the layout for maintenance. I gave it to our loco guru Don to go over with a fine toothcomb - he found the body was not quite seated on the frame one end and this was inhibiting the bogie movement.

SP F3A & F3B 6103 

The Proto 2000 set on an ore train failed. They have QSI V7 Decoders some of the few left.

F7A 6103

The QSI Decoder was removed...  Replacement is a Tumaini 2.

With the 'lid off" I took the opportunity to oil the bearings and grease the worm.

Striped

Pickup, Motor & Speaker wires done.

Well two yellows (Mars & +ve) and the blue for number boards & white for headlight.

I decided to use a spare output for a cab light.

When all wired up I painted the LED behind the wall black


F7B 6103

The QSI Decoder was removed...  Replacement is a Tumaini 2.

With the 'lid off" again I took the opportunity to oil the bearings and grease the worm.


Unused wires secured by Kapton tape before installation.


The Locos will no longer be paired. The A unit will be speed matched to a new Genesis F3AB set to form a double ended consist for Ore train service.  The B unit will be placed in service with a pair of SD9's on the Oil Train.  All locos will need to be speed matched for their service needs.

Speed matching in the workshop




Ops Sessions

I held two sessions since my last update.


HCS 9th November- Session #92


Barry, Denis, Graham, John, Paul and Peter S joined me and we ran Session 4.

L>R Barry, Paul, Peter S, Graham, Denis & John.

We ran session 4. I spent most of my time mentoring Barry on Hornertown Yard movements.  We all had some fun during the session









Afterwards we enjoyed afternoon tea and a good chat.




HCS 29th November - Session #93

Alex, Don, Graham, Hugh, John and Paul joined me and we ran session 5 .  

L>R Alex, Paul, Peter J, Don, Hugh & John

There were very few glitches, and we all had some fun and enjoyed the session.






Afterwards we enjoyed afternoon tea and a good chat.





Tasks Completed since last update



Scheduled Tasks coming up





That's it for now so until next time.....






-ooOOOoo-