Saturday, May 15, 2010

Tunnel Portal works continue + wiring

More work on the portal and some progress this week on wiring turnouts and main control panel for the top level. Testing operation from the panel and fine adjustments for best operation after terminations.


Huntington Tunnel Portal

BJ continues detailing the portal










Main Layout top level control panel termination strips

Six turnouts left to wire! They are all close to the panel location.




Main Layout Booster 1 Wiring Top Section

A Digitrax PM42 provides four power districts and five Block Watchers provide the block sensing for signal inputs.

No comments:

Post a Comment