Tuesday, May 18, 2010

Huntington Loco Fuel Tank

BJ has been at work again

Starting with a morning coffee followed by a visit to the local hobby shop to collect some hardwood the construction commenced. Totally scratch built in what seemed like a few hours was the tank stand and tank.

Pipework is being added prior to painting.

Below are some pics of the construction work and trial assembly.

The stand



The four sides










The tank




The stand over the track




The assembled product








Final product after painting






Note the pump house and suction pipe for connection to delivery tank car.



A great job BJ!

No comments:

Post a Comment