This month has seen things happening on Scenery, Structures, Sounds for EVNGR, Maintenance, Ops Sessions, Tasks completed & scheduled.
Flintston Cold Stores
Peter J kit bashed the building from a Walthers building kit I obtained from Wayne some time back added colours, weathering and textures. I think it has come up well.
Next we will apply the concrete look to the platform areas.
Flintston Warehouse
I painted the area under the platforms in the track wells.
Sounds for EVNGR
I finished the two sound modules with ultrasonic detection causing operation.
One for his town and the other for his mine.
After testing he wanted the playing time after "no detection" increased from 10 to 30 seconds.
The volume level for the granary module had it volume level lowered as well.
He installed the speaker at the mine underneath on a joist.
The volume knob on the fascia and the movement detector just below the fascia.
I ordered a more robust 12V power supply for his accessories.
I has arrived and I have made the necessary connections ready for him to install and put to use.

























