Thursday, October 26, 2023

October update

               

A quiet month activities have included: Interstate trip, Visiting Layouts, Ops Session, Tasks Completed & Scheduled.

*** Updated - approx 5 hrs after initial posting ***


Interstate Trip


I flew to Melbourne then caught the Velocity to Traralgon to catch up with Peter R.

Just after take off

Platform for train to Traralgon





Visit to Derek's


Some of you will remember Derek who used to be part of our Monday round robin group. Unfortunately he moved to Melbourne Victoria for his retirement.  Whist staying with Peter R in Sale for a week or so I was fortunate to catch up with Derek whilst we were travelling around.  

I didn't realise it had been over four years since I last visited him and at that time he was in the planning phase for his new N scale layout.  

I am pleased to report construction has started and he has been doing some fancy Arduino work for block occupancy detection and yard ladder control of tortoise switch machines.

Peter, Me and Derek

Construction underway

Plans including cutting schedules

Lower staging yard

Staging with occupancy LED's in ties

Island oval helix

The curves in the helix are super elevated


Here is a video of a couple of trains running





Block Detection & Track Selection



Derek has build his own current detectors to work with an Arduino nano

Three block current detectors and their nano

Track occupancy LEDS Green available & Red occupied

Select desired track by pushbutton and turnouts operated by
tortoises align and indicator lights and track number shown

Alternate Switch Motors

Where headroom was an issue using a tortoise he is using mtb MP5's








Animas & Lobato Southern


It has been four years since Peter and I visited Bill and this time Derek came too and I got to run a train through the system. I now have a better understanding of the layout albeit basic.

We were welcomed with a cuppa and biscuit

I chose an NCE hammerhead radio throttle like mine


Here is a video showing some of my travels around the lovely Sn3 layout







Ops Sessions at Wayne's


Two sessions this month.

Ops Session on 11th


I attended an Ops Session on 11th along with Alan, Des, Don & Murray.

We had an enjoyable afternoon I had mostly mainline work which was a nice change from being Yardmaster.

L>R Wayne, Alan, Murray, Des & Don

Don at Lowood Crossing



Wayne & Des at Red Rock

Wayne and Murray at Dunkleigh Towers

Des working Stockers Siding

Murray working Dunkleigh Towers


Alan at Eden Valley

Wayne on the prowl while I was having a crib break

Really?


Here is a link to a short video



Ops Session on 26th


I was interstate but Don sent me some pics,  Those attending Waynes were Barry, Don, Dennis, Peter J & Peter S.













Thanks for the photos Don!




Tasks Completed in last 30 days 


None!





Scheduled Tasks for next 90 days







That's it for now so until next time.....






-ooOOOoo-


Wednesday, September 27, 2023

September Update

             

A quieter month activities have included Scenery, Consisting, Ops Session, Planning for Peter J's and Spacky's layouts, Tasks Completed & Scheduled.



Onka Valley Scenery


The bottle of Realistic Water has arrived and the top pourings have been completed.








Throttle Consisting


My coal train has double headed steam locos and with the new operating sessions they don't just travel through the layout and arrive at the loco depot.  They are required to be serviced so must be de-consisted and individually turned on the turntable service then reconsisted for the ongoing journey.

I have prepared an instruction card to help/remind operators of the correct methods.





My Ops Sessions


I scheduled two sessions this month as I will be away for a while next month.  The goal for this year was to complete the full 8 sessions making up the full cycle of sessions for the very first time. 


4th September

Barry, Chris, Dennis, Des, Don, John & Wayne joined me and we had fun.  Unfortunately Ross came down sick and missed out so I was one operator down but the new schedule has one "severable operator position" based on my previous experieces.

There were a few issues as this was the first time session 6 has ever run.  F7B in the middle of a consist died, a couple of ommissions on the Hornetown arrival/departures checklist at Hornertown, I forgot to "cycle the waybills" on the staged Express Goods so the cars in the consist did not have their "next destination" updated so were destimed to go back to where they came from - this overloaded the classification track causing aome unforseens problems.  I will sort "the mess out" before the next session.

Wayne & Dennis at Hornertown

Don & Chris at Jimtown

John running the express goods while Barry has a rest

Chris and Barry watching Hornertown movements


Don & Des chatting to Wayne

John running the Flinston Local

Des in the crew room between assignments

Barry in the crew room between assignments

The session finished on time and afterwards we enjoyed afternoon tea.


18th September


Unfortunately due to sickness and other commitments we did not have enough operators so the session was cancelled the day before.



So I won't acieve my goal of running all 8 sessions this year - oh well...




Ops Sessions at Wayne's

I was a reserve for the first session Wednesday 9th bt Due to sickness the session was cancelled. The second session scheduled for Thurday 27th and it suffered the same fate as the 9th.


Modeling Session at Peter S's


Due to Family matters I was unable to make it - Sorry Peter.




Planning for Peter J


Peter came to visit in lieu of my second cancelled Ops Session and we discussed what Don & I had come up with.  I presented him with a folder containg a printed version of all the planning.  He stayed for around 3 hours during which time I setup a speadsheet for waybill production which he has subsequently filled out in a Shared Dropbox folder and I used mail merge to produce a print file and Peter did the rest.

We further refined the Job Cards for the Yardmasters and did some minor updates to the Train Graphs.

Peter has constructed and installed the Car Card Boxes for the various locations.

The plan is to run Session 1 for the first time on 9th October. 




Planning for Spacky


Spacky came to visit ans stayed over for a night and we managed to start to document what he wants from his new layout which he hopes to commence in his new trainroom which is currently under construction,

He is constructing a space of approximately 9.5 metres by 9.0 metres.

I played around with the space and provided him with an idea to consider.

Botton Level

Top Level


Now I wait for Spacky to do some "doodling" on possible track configurations - He may scrap what I suggested too!




Tasks Completed in last 30 days 


Here is the new report without any duplicat entries from the previous month.  The biggest job was track cleaning and re-applying the CRC 2-26 on all mainlines, branch lines and yards which I did over two days.







Scheduled Tasks for next 90 days





That's it for now so until next time.....






-ooOOOoo-