Friday, November 29, 2019

November Update



This month activities included building a cement loading facility, wood loads, two ops sessions and that new booster.



Cement Loading Facility


I bought this kit on eBay some time back and finally put it together see the progress pictures below.









I needed to adjust the height above the rails so I made some "Concrete foundations" from balsa wood and glued the structure on them.


Testing for clearance


Time to paint the foundations.


Colour looks about right!






Time for some weathering with a sprayed on india ink wash.





Positioned on the layout for trial loading before fixing permanently





Modelling Wood Loads


I am following Wayne's lead and have been preparing some wood loads using balsa stock and printed sticky labels cut to wrap them.  I need 30 packs to fill the bulkhead flat.







Ops Session at Wayne's


Barry, Chris, Des, Don, Peter S and I joined Wayne for the ops session.  We had a fun time but we had a turn out failure at the entrance to the hidden staging yard which resulted in a blocked approach so three trains were cancelled until maintenance could attend to the problem.

Peter and Wayne

Don at Lowood Crossing

Des at Red Rock

Des and Peter S at Red Rock and Wayne at Waverly

Wayne at Dunkleigh Towers

Chris and Des approaching Valley Junction

Peter S and Barry Shunting at Red Rock

Barry & Peter S at Red Rock and Chris and Des at Dunkleigh Towers


Enjoying afternoon tea after the run

Peter S and Barry

Don, Des and Chris

Barry & Wayne



Ops Session at Ross's


Barry, Chris, Don, Rosslyn and I joined Ross for a running session which lasted for about one and a half hours.  We enjoyed supper afterward.



Don, Barry & Rosslyn

Just where did that train go?

Ross & Chris




New Booster


It is still on back order......   I emailed the Canadian supplier a couple of days ago and have just received a reply that it is still in Germany....






That's it for now so until next time.....





-ooOOOoo-