BJ got busy with the air brush this week...
The foundations have been laid for the grain silos
And the last of the foam has beem secured and basic shaping done ready for plaster work.
Friday, February 19, 2010
Tuesday, February 16, 2010
Winery Loading Platform Arrives
BJ has been busy again!
The progression is shown below
I'd better get handy with the rail brown here as the shinny rail sides don't fit with the rest of the scenery!
A bit more work has been done on the tunnel area too
Wiring Continues in the main layout area
Installing the six core point wires between the layout and the mainline panels to enable turnout operation and position reporting
Main panel terminal strips
Spot the under bench workers behind loco
A close up = Rossco (Left) & Ross (Right) checking nad tagging wires under the layout. Ross was not available when the "Monday Night Crew" photo was taken - see my first post.
The progression is shown below
I'd better get handy with the rail brown here as the shinny rail sides don't fit with the rest of the scenery!
A bit more work has been done on the tunnel area too
Wiring Continues in the main layout area
Installing the six core point wires between the layout and the mainline panels to enable turnout operation and position reporting
Main panel terminal strips
Spot the under bench workers behind loco
A close up = Rossco (Left) & Ross (Right) checking nad tagging wires under the layout. Ross was not available when the "Monday Night Crew" photo was taken - see my first post.
Friday, February 5, 2010
Winery Arrives at Huntington
Subscribe to:
Posts (Atom)