Tuesday, February 16, 2010

Winery Loading Platform Arrives

BJ has been busy again!

The progression is shown below







I'd better get handy with the rail brown here as the shinny rail sides don't fit with the rest of the scenery!

A bit more work has been done on the tunnel area too





Wiring Continues in the main layout area


Installing the six core point wires between the layout and the mainline panels to enable turnout operation and position reporting



Main panel terminal strips



Spot the under bench workers behind loco



A close up = Rossco (Left) & Ross (Right) checking nad tagging wires under the layout. Ross was not available when the "Monday Night Crew" photo was taken - see my first post.

No comments:

Post a Comment